Project Description: |
MANSFIELD- BRIDGE REPLACEMENT, M-03-003 & M-03-045, BALCOM STREET OVER THE WADING RIVER
This project includes the replacement of two adjacent bridges on Balcom Street over the Wading River. The bridges will be closed during construction and a detour will be in place. A temporary pedestrian bridge may be required.
|
Location: |
|
Construction Begins: | Autumn 2023 |
Resident Engineer: | Sean Darling![]() |
Construction Bid Price: | $2,959,170.00 |
District: | District 5 |
|
Bridges
|
|
|
|
|