Project Description: |
COLRAIN- BRIDGE DEMOLITION, BR# C-18-009, SHATTUCKVILLE ROAD OVER THE NORTH RIVER
This project will remove the existing bridge structure and deliver it to the University of Massachusetts for use in its Engineering Program for Restoration of Historic Bridges. A replacement structure at this location has not yet been proposed.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Municipality |
Project Manager: | Albert Li |
Estimated Total Contract Cost: | $140,022.20 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|