| Project Description: |
DISTRICT 4- HERBICIDE APPLICATION TO VARIOUS STATE RIGHT OF WAYS TO CONTROL NUISANCE VEGETATION
Herbicides will be applied to control vegetation under guardrails along curbs for safety purposes.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Thomas Ferris Jr![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 05/31/2003 ) |
|
Bridges |
||||||
|
|
|
|||||||||||