TYNGSBOROUGH- RELOCATION OF ROUTE 113 (PAWTUCKET BOULEVARD)
The work on this project will include the relocation of Pawtucket Boulevard for a distance of approximately 3700 linear feet from just south of the Colony Heights condominium complex driveway northerly to the existing Tyngsborough Bridge over the Merrimack River. The roadway will vary in width from 2-4 travel lanes with additional turning lanes at the intersections. It is anticipated that the two realigned intersections will be signalized. At least a 4’ continuous shoulder should be provided in each direction to accommodate bicyclists.
|