Project Description: |
NORWOOD- SHARON- WALPOLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 1
The work under this contract consists of resurfacing the roadway, replacing the existing traffic signal loop detectors, and rebuilding the drainage along Route 1 NB & SB in the Towns of Sharon, Walpole and Norwood for a distance of 7.1 miles.
|
Location: |
|
Resident Engineer: | Brian Lewis |
Construction Contract Value: | $3,854,369.85 |
Construction Bid Price: | $2,932,905.00 |
Initial Construction Estimate: | $3,079,600.00 |
District: | District 5 |
|
Bridges |
|
|
|
|