| Project Description: |
WESTMINSTER- POSTED PROPOSAL TO COVER COST OF BOTTLED WATER AND CONNECTING JONES PROPERTY TO TOWN WATER CONTAMINATED BY SODIUM
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Henry Barbaro![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 02/22/2003 ) |
|
Bridges |
||||||
|
|
|
|||||||||||