Project Description: |
WESTMINSTER- POSTED PROPOSAL TO COVER COST OF BOTTLED WATER AND CONNECTING JONES PROPERTY TO TOWN WATER CONTAMINATED BY SODIUM
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Henry Barbaro |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 02/22/2003 ) |
|
Bridges |
|
|
|