Project Description: |
NORTHBOROUGH- POSTED PROPOSAL TO CONNECT THE DEL DUCA PROPERTY (CONTAMINATED BY WINTER MAINTENANCE) ON ROUTE 20 TO TOWN WATER
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Richard Mantha Jr |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 03/15/2003 ) |
|
Bridges |
|
|
|