Project Description: |
MILLVILLE- UXBRIDGE- ROUTE 146 RESURFACING
The purpose of this project is to resurface Route 146 from the Rhode Island border to just north of the Chocolog Road interchange in Uxbridge, a distance of approximately 3.7 miles. Interchange ramps will also be included.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $4,830,865.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|