MILLVILLE- UXBRIDGE- ROUTE 146 RESURFACING
The purpose of this project is to resurface Route 146 from the Rhode Island border to just north of the Chocolog Road interchange in Uxbridge, a distance of approximately 3.7 miles. Interchange ramps will also be included.
Location:
  • Town of Millville
  • Town of Uxbridge
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: Other
    Project Manager: Albert Li
    Estimated Total Contract Cost: $4,830,865.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information