| Project Description: |
BOXFORD- POSTED PROPOSAL TO COVER THE COST OF REPLACING A WELL AND WATERLINE CONNECTION ON PRIVATE PROPERTY ON SILVERBROOK ROAD
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Henry Barbaro![]() |
| Estimated Total Federal Participating Construction Cost: | $4,500,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 06/21/2003 ) |
|