WEST SPRINGFIELD- ROUTE 20 PLANING AND RESURFACING
The project begins 680 feet west of Locus Street and proceeds easterly on Route 20 in West Springfield to the intersection with Kings Highway. The work to be performed includes: coldplaning and resurfacing the roadway and adjacent side streets; adjusting, rebuilding and cleaning drainage structures; excavating existing sidewalks, driveways and asphalt curb; constructing new cement concrete sidewalks and wheelchair ramps; constructing new hot mix asphalt driveway aprons and curb; removing and resetting existing granite curb; replacing guard rail; excavating existing traffic islands and constructing scored concrete pavement traffic islands; providing temporary and permanent pavement markings; and tree trimming. The total project length is approximately 1.7 miles.
Location:
  • Town of West Springfield
  • Resident Engineer: Michael McCabe
    Construction Contract Value: $1,705,951.00
    Construction Bid Price: $1,358,654.25
    Initial Construction Estimate: $1,122,061.00
    District: District 2
    Current Status: Physical work complete (as of 11/08/2006)

    Contracts (1) Progress
    # 41115 -- Construction Contract
    West Springfield- Rte 20 - Highway Construction/Surfacing Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 09/15/2005
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Physical work complete
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/02/2003
    Project Review Committee PRC Approved 04/14/2003
    Project Review Committee Letter 05/19/2003
    Project Status Advertised 12/25/2004
    Project Management
    Final Design PS&E Received 03/30/2004
    Final Design PS&E to FAPRO 12/17/2004