| Project Description: |
LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR (DESIGN-BUILD)
Install fiber optic backbone along the corridor. Install cameras, DMS, and detectors at key locations along the corridor as defined in the feasibility study.
|
| Location: |
|
| Resident Engineer: | Jon Widdison![]() |
| Construction Contract Value: | $38,976,745.71 |
| Construction Bid Price: | $30,761,644.34 |
| Initial Construction Estimate: | $32,000,000.00 |
| District: | District 2 |
|