Project Description: |
LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR (DESIGN-BUILD)
Install fiber optic backbone along the corridor. Install cameras, DMS, and detectors at key locations along the corridor as defined in the feasibility study.
|
Location: |
|
Project Manager: | Meryl Ann Mandell |
Estimated Total Contract Cost: | $38,976,745.71 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|