| Project Description: |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS TO BRIDGES AT VARIOUS LOCATIONS
This contract provides for various artisans and materials to perform non-routine and emergency repairs to the District 5 bridges on a 24 hour basis.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $1,800,000.00 |
| District: | District 5 |
| Current Status: | This project has been advertised for construction bids. (as of 11/15/2003 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||