Project Description: |
MILLBURY- BRIDGE REPLACEMENT, BR# M-22-009, MCCRACKEN ROAD OVER BLACKSTONE RIVER
This project entails the removal and replacement of the existing McCracken Road bridge deck over the Blackstone River, in its existing alignment. The proposed deck and abutment improvements will replace the existing temporary Acrow panel structure. There will be no vehicular access to the bridge during construction.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Michael O'Dowd |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 09/13/2003 ) |
|