| Project Description: |
DISTRICT 4- EMERGENCY REPAIRS TO FENDER SYSTEMS AND TIMBER PILES AT VARIOUS DRAWBRIDGES (11 BRIDGES)
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $1,000,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 05/22/2004 ) |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||