Project Description:
WESTMINSTER- BRIDGE REPLACEMENT, W-28-019, DEPOT ROAD OVER ROUND MEADOW BROOK
The scope of work includes the replacement of the existing structure with single span steel stringers and a composite cast-in-place concrete deck at Depot Road with improvements to the approach roadways.
Location:
  • Town of Westminster
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Michael Papadopoulos
    Estimated Total Contract Cost: $1,343,440.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W28019 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project