Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
SANDISFIELD- BRIDGE REPLACEMENT, S-03-004, ROUTE 8 & 57 OVER THE WEST BRANCH FARMINGTON RIVER
The purpose of this project is to replace the bridge carrying Route 8 and Route 57 over the West Branch Farmington River in the Town of Sandisfield. The existing bridge, which was built in 1930 and reconstructed in 1991, has a curb-to-curb width of 30 feet with one 5.9-foot sidewalk. The proposed bridge will maintain the same curb to curb width and sidewalk width. Main Street is a two-lane, two-way, rural minor arterial. Work on the roadway will include full depth reconstruction of 300 feet beyond the bridge on both approaches. Once beyond the limits of reconstruction, the pavement will be cold planed to match the existing pavement on the two approaches. The proposed bridge will be constructed north of the existing bridge prior to the demolition of the existing bridge; this makes available two lanes of opposing traffic and pedestrian access at all times.
Location:
  • Town of Sandisfield
  • Resident Engineer: Joseph Mastroianni
    Construction Contract Value: $3,553,857.00
    Construction Bid Price: $3,081,963.20
    Initial Construction Estimate: $3,529,744.10
    Total Estimated Project Cost: $300,000.00
    District: District 1

    Contracts (5) Progress
    # 54136 -- Design -- Hwy Eng Open End
    Work will consist of provide engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 54837 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 64300 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68382 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 71228 -- Construction Contract
    Bridge Replacement (S-03-004) (Steel ) - Routes 8 & 57 (Standisfield Road) over the West Branch of the Farmington River. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/06/2012
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 09/26/2003
    Project Review Committee PRC Tabled 11/18/2003
    Project Review Committee PRC Approved 12/03/2003
    Project Review Committee Letter 01/05/2004
    Project Status Advertised 09/24/2011
    Project Management
    25% Design 25% Package Received 11/17/2009
    25% Design 25% Package Received 09/28/2010
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 12/08/2009
    25% Design 25% Package Comments to DE 02/01/2010
    25% Design 25% Package Comments to DE 10/18/2010
    25% Design 25% Package Comments to DE 10/27/2010
    25% Design 25% Package Comments to DE 10/29/2010
    25% Design 25% Package Approved 04/06/2010
    25% Design Design Public Hearing 05/04/2010
    25% Design 25% Plans Complete 04/06/2010
    75% Design 75% Package Received 01/17/2011
    75% Design 75% Package Comments to DE 02/03/2011
    75% Design 75% Package Comments to DE 02/10/2011
    75% Design 75% Package Comments to DE 02/11/2011
    75% Design 75% Package Comments to DE 02/14/2011
    75% Design 75% Package Comments to DE 03/01/2011
    75% Design 75% Package Comments to DE 03/31/2011
    Final Design PS&E Received 07/14/2011
    Final Design PS&E to FAPRO 09/16/2011
    Consultant Contract Process Scope to DE 09/15/2008
    Consultant Contract Process NTP Issued 12/16/2008