Project Description:
GREENFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT 8 INTERSECTIONS
This project consists of installing new traffic signals, resurfacing, curbing, sidewalks, wheelchair ramps, signs and pavement markings at the following eight intersections in Greenfield: Location 1-- Elm Street at Colrain Street and Solon Street. Location 2-- Conway Street at Allen Street. Location 3-- Deerfield Street at Meridian Street. Location 4-- Deerfield Street at Mill Street and Bank Row. Location 5-- Federal Street at Main Street. Location 6-- Federal Street at Silver Street. Location 7-- High Street at Silver Street. Location 8-- French King Highway at Loomis Street.
Location:
  • Town of Greenfield
  • Project Manager: Brian Chapman
    Estimated Total Contract Cost: $3,229,270.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information