Project Description: |
MANSFIELD- RECONSTRUCTION OF ROUTE 106 (CHAUNCY STREET) INCLUDES RAILROAD BRIDGE M-03-019
The proposed project consists of the rehabilitation of the Chauncy Street underpass structure, its' pumping facility, and the storm water drainage and discharge system in Mansfield. The underpass has experienced flooding and ground water seepage onto the roadway. During cold temperatures, the seepage freezes on the roadway and causes hazardous conditions. This project will mitigate these problems.
|
Location: |
|
Resident Engineer: | Thomas Kewriga |
Construction Contract Value: | $5,605,448.63 |
Construction Bid Price: | $4,313,313.31 |
Initial Construction Estimate: | $4,836,960.50 |
District: | District 5 |
|
Bridges
|
|
|
|
|