ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L.
The project limits are from the Framingham T.L. to the Holliston T.L., a distance of 1.7 miles. The project consists of miling and resurfacing with minor box widening. Traffic improvements at the intersection of Route 126 and Elliot Street entail signalization, stone masonry retaining wall construction, minor drainage improvements, installation of granite curbing and edging, construction of sidewalks and the resetting of guardrail.
Location:
  • Town of Ashland
  • Construction Begins: Autumn 2020
    Resident Engineer: Linda Terry
    Construction Bid Price: $19,667,628.00
    District: District 3

    Contracts (2) Progress
    # 111717 -- Construction Contract
    Roadway Reconstruction and Related Work along Route 126 (Pond Street). 91% Complete
    # 77863 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/06/2020
    Contract Information
    Project Designer: Consultant
    Funding Source: FA - Surface Trans. Block Grant (STBG)
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 11/07/2003
    Project Review Committee PRC Approved 11/18/2003
    Project Status Advertised 06/27/2020
    Project Management
    100% Design 100% Package Received 01/21/2020
    100% Design 100% Package Comments to DE 03/06/2020
    25% Design 25% Package Received 01/20/2015
    25% Design 25% Package Received 09/23/2015
    25% Design 25% Package Comments to DE 10/06/2016
    25% Design Design Public Hearing 12/06/2016
    75% Design 75% Package Received 03/28/2018
    75% Design 75% Package Comments to DE 12/06/2018
    Final Design PS&E Received 05/11/2020
    Final Design PS&E Received - Resub 1 06/12/2020