DEERFIELD- MONTAGUE- BIKE TRAIL CONSTRUCTION, FRANKLIN COUNTY BIKEWAY (PHASE I, Part A)
This proposed project was originally a part of Project # 602958 Franklin County Bikeway (Phase 1, Part B) in Montague that was advertised August 23, 2003. This phase of the bikeway project begins at McClelland Farm Road and continues north along existing abandoned railroad right-of-way before terminating at Montague City Road for a distance of approximately 1.3 miles. The project also includes the modification of the three span, wood trestle, former railroad bridge over the Connecticut River into a bikeway bridge.
Location:
  • Town of Montague
  • Project Manager: Philip Macdonald
    Estimated Total Contract Cost: $2,024,547.82
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project