| Project Description: |
CONCORD- ARCHIVES FACILITY #62, 215 ELM STREET, ROUTE 2
Install a Pre-Engineered building 150'x60'with eave hights of 20'
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Bassam Salfity![]() |
| Estimated Total Contract Cost: | $1,217,015.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||