Project Description:
SOUTHWICK- RECONSTRUCTION OF ROUTE 10/202 (COLLEGE HIGHWAY - CENTER SECTION) FROM TANNERY ROAD TO 0.2 MILES SOUTH OF ROUTE 57
The project begins at Tannery Road and proceeds southerly ending at 445 College Highway Guiel’s Auto Body. The drainage system will include a drainage trunk line that will run along Tannery Road approximately 1377 feet ending where Slab Brook meets Tannery Road. The total length of the project is approximately 1.5 miles. The work to be done under this contract includes full depth reconstruction, cold planing, resurfacing, box widening with the addition of an exclusive center turning lane, concrete sidewalks and concrete wheelchair ramps, traffic signal reconstruction at two intersections, the extension of a culvert, drainage improvements and ornamental street lighting.
Location:
  • Town of Southwick
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Carrie Lavallee
    Estimated Total Contract Cost: $5,500,440.58
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project