Project Description:
|
SOUTHWICK- RECONSTRUCTION OF ROUTE 10/202 (COLLEGE HIGHWAY - CENTER SECTION) FROM TANNERY ROAD TO 0.2 MILES SOUTH OF ROUTE 57
The project begins at Tannery Road and proceeds southerly ending at 445 College Highway Guiel’s Auto Body. The drainage system will include a drainage trunk line that will run along Tannery Road approximately 1377 feet ending where Slab Brook meets Tannery Road. The total length of the project is approximately 1.5 miles. The work to be done under this contract includes full depth reconstruction, cold planing, resurfacing, box widening with the addition of an exclusive center turning lane, concrete sidewalks and concrete wheelchair ramps, traffic signal reconstruction at two intersections, the extension of a culvert, drainage improvements and ornamental street lighting.
|