Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
SOUTHWICK- RESURFACING & RELATED WORK ON ROUTE 10/202, COLLEGE HIGHWAY (NORTHERLY SECTION) FROM THE WESTFIELD T.L. TO TANNERY ROAD (1.33 MILES)
The proposed work consists of cold planing and resurfacing the entire section; repairing cross culverts and box widening. Box widening areas include Sta 0 00 to Sta 0 73, Sta 2 16 to Sta 2 85, and Sta 11 88. The box widening will provide 30ft width to meet bicycle accommodations.
Location:
  • Town of Southwick
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Adam W Kiel
    Estimated Total Federal Participating Construction Cost: N/A
    Total Estimated Project Cost: $1,500,000.00
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project