Project Description: |
SOUTHWICK- RESURFACING & RELATED WORK ON ROUTE 10/202, COLLEGE HIGHWAY (NORTHERLY SECTION) FROM THE WESTFIELD T.L. TO TANNERY ROAD (1.33 MILES)
The proposed work consists of cold planing and resurfacing the entire section; repairing cross culverts and box widening. Box widening areas include Sta 0 00 to Sta 0 73, Sta 2 16 to Sta 2 85, and Sta 11 88. The box widening will provide 30ft width to meet bicycle accommodations.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Adam W Kiel |
Estimated Total Contract Cost: | $3,300,000.00 |
Estimated Total Federal Participating Construction Cost: | $3,600,000.00 |
Total Estimated Project Cost: | $1,500,000.00 |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|