| Project Description: |
DISTRICT 3- SCHEDULED AND EMERGENCY BRIDGE SUBSTRUCTURE REPAIR
The work to be done includes the removal of deteriorated concrete from the bridge and its replacement with new materials. Repairs will also be performed on the bridge bearings and the slopes under the bridge.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 02/14/2004 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||