Project Description: |
TOWNSEND- BRIDGE REPLACEMENT, T-07-011, VINTON POND ROAD OVER PEARL HILL BROOK
The project limits for the Viton Pond Road bridge project are from High Meadow Road to DiBendedetto Drive and includes work on Wellesley Street from South Avenue to the Weston High School. The work also includes a new traffic signal system, channelization, new curbing and sidewalks. A design exception may be required for the proposed shoulder width.
|
Location: |
|
Resident Engineer: | Frederick Stacy |
Construction Contract Value: | $706,181.26 |
Construction Bid Price: | $635,113.50 |
Initial Construction Estimate: | $788,955.50 |
District: | District 3 |
|
Bridges
|
|
|
|
|