| Project Description: |
GARDNER- WESTMINSTER- RESURFACING AND RELATED WORK, ROUTE 2 TO ROUTE 140N
The purpose of this project is to resurface Route 2 from the Route 2 Bridge over Route 2A in Gardner easterly to the Route 2 Bridge over Route 140N in Westminster, a distance of approximately 3.5 miles.
|
| Location: |
|
| Resident Engineer: | Steven Toloczko![]() |
| Construction Contract Value: | $7,536,216.00 |
| Construction Bid Price: | $5,247,651.05 |
| Initial Construction Estimate: | $3,983,910.00 |
| District: | District 3 |
| Current Status: | (as of 06/21/2005) |
|