AGAWAM- INTERSECTION IMPROVEMENTS AT ROUTE 187 & ROUTE 57
The proposed project consists of traffic signal and intersection improvements at the intersection of Routes 187 and 57 in Agawam, including geometrical improvements; additional auxiliary and wider lanes; improved lane usage markings and signing; improvements to the Granger School pick-up and drop-off areas; and revised signal phasing and timing. Pedestrian improvements and bicycle accommodations consisting of a 5’ bicycle lane have been provided in accordance with applicable design guides.
Location:
  • City of Agawam
  • Construction Begins: Winter 2018/2019
    Resident Engineer: Hannah Lapointe
    Construction Bid Price: $2,823,495.00
    District: District 2

    Contracts (1) Progress
    # 105645 -- Construction Contract
    Intersection Improvements and Related Work (Including Signals) at South/North Westfield Streets and Southwick/Springfield Streets (Routes 187 at 57/147) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/13/2019
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 07/21/2004
    Project Review Committee Letter 07/19/2004
    Project Status Initiated 04/28/2004
    Project Status Advertised 08/25/2018
    Project Management
    100% Design 100% Package Received 05/04/2018
    100% Design 100% Package Comments to DE 06/21/2018
    25% Design 25% Package Received 03/21/2017
    25% Design 25% Package Comments to DE 06/16/2017
    25% Design Design Public Hearing 10/25/2017
    75% Design 75% Package Received 01/22/2018
    75% Design 75% Package Comments to DE 03/05/2018
    Final Design PS&E Received 08/02/2018
    Final Design PS&E to Peer Reviewer 06/04/2018
    Final Design Peer Review Comments to DE 07/13/2018
    Final Design PS&E to FAPRO 08/13/2018