Project Description:
SPRINGFIELD- BRIDGE PRESERVATION, S-24-032, STATE STREET OVER ROOSEVELT AVENUE
The proposed project consists of the rehabilitation of the bridge carrying State Street over Roosevelt Ave. The bridge was originally designed to carry both vehicular and trolley traffic. The main portion of the bridge supporting the roadway is structurally sound and capable of carrying an HS20 load. The facades of the bridge are the problem area and a potential safety hazard. The utilities (two major gas mains, telephone, and electric) are located in the severely deteriorated sidewalk vaults. These utilities may be compromised with further deterioration. Protective shielding has been installed on this bridge to prevent deteriorated material from into the roadway below. This is only a temporary measure. Upgrades to the barrier system are also necessary.
Location:
  • City of Springfield
  • Resident Engineer: Donald Tatro, Jr.
    Construction Contract Value: $2,358,692.19
    Construction Bid Price: $1,964,743.75
    Initial Construction Estimate: $1,998,534.75
    District: District 2

    Contracts (1) Progress
    # 57759 -- Construction Contract
    Bridge Rehabilitation and Related Work at Various Locations. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 03/30/2009
    Contract Information
    Project Designer: Municipality
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Tabled 06/22/2004
    Project Review Committee PRC Approved 04/21/2005
    Project Status Initiated 06/07/2004
    Project Status Advertised 11/15/2008
    Project Management
    100% Design 100% Package Received 04/10/2008
    100% Design 100% Plans Complete 09/30/2008
    Final Design PS&E Received 11/05/2008
    Final Design PS&E to FAPRO 11/12/2008