Project Description:
ROYALSTON- RECLAMATION OF ATHOL RICHMOND ROAD (ROUTE 32), FROM ELM AVENUE TO THE N.H. S.L
The scope of work for the proposed project is to reconstruct Athol Richmond Road in the Town of Royalston from Elm Avenue in Royalston to the New Hampshire state border. The length of the roadway is approximately 5.3 miles. Under this program, the roadway is to be reconstructed within the footprint of the existing roadway and widened in areas as appropriate for safety reasons. Cross culverts along the entire project length will be evaluated and considered for replacement as required either by condition or hydraulic capacity. At certain selected locations, the roadway will be evaluated to determine if the profile can be raised in order to alleviate local flooding which has occurred mostly due to the lack of adequate pipe size and beaver activity. All of this needs to be balanced against the impacts to the adjacent wetland resource areas and trees which line the roadway. Finally, new pavement markings and signage will be installed to delineate travel on the new roadway.
Location:
  • Town of Royalston
  • Resident Engineer: Ralph Romano
    Construction Contract Value: $3,473,902.00
    Construction Bid Price: $3,129,720.50
    Initial Construction Estimate: $4,103,584.25
    District: District 2

    Contracts (1) Progress
    # 60858 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of Route 32 (Athol Richmond Road). (ARRA Project) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/27/2009
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 06/22/2004
    Project Review Committee Letter 07/19/2004
    Project Status Initiated 06/07/2004
    Project Status Advertised 09/12/2009
    Project Management
    100% Design 100% Package Received 06/26/2009
    100% Design 100% Package Comments to DE 08/13/2009
    25% Design 25% Package Received 04/11/2008
    25% Design 25% Package Comments to DE 09/22/2008
    25% Design 25% Package Approved 09/15/2008
    25% Design Design Public Hearing 10/23/2008
    75% Design 75% Package Received 02/13/2009
    75% Design 75% Package Comments to DE 03/12/2009
    Final Design PS&E Received 08/24/2009
    Final Design PS&E to FAPRO 09/02/2009