| Project Description: |
LEE- DUMPING GROUND CLOSURE AND WETLAND RESTORATION AT HIGHWAY MAINTENANCE FACILITY #7 OFF ROUTE 102
This project's 36 month construction period includes two years necessary to monitor the restoration area.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Mark Carmichael![]() |
| Estimated Total Contract Cost: | $484,486.47 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|