| Project Description: |
NEWBURY- RESURFACING AND RELATED WORK, ROUTE 1A (HIGH ROAD)
This project involves the resurfacing of Route 1A (High Street) from the Rowley town line to the Newburyport city line. The project length is approximately 4.1 miles. The project includes removing brush from the roadway edge and repairing drainage structures.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $1,034,599.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|