Project Description:
OXFORD- WEBSTER- RESURFACING AND RELATED WORK, I-395
This project consists of resurfacing Route I-395 in Webster from the Massachusetts/Connecticut State Line, northerly about 4.0 miles to the Webster/Oxford Town Line and then continuing northerly into Oxford about 0.5 miles, for a total distance of approximately 4.5 miles. The limits of work include the entire ramp systems at Exit #1 (including Union Point Road from Thompson Road easterly to the state highway layout line), Exit #2 and Exit #3.
Location:
  • Town of Oxford
  • Town of Webster
  • Project Manager: Albert Li
    Estimated Total Contract Cost: $6,164,885.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project