| Project Description: |
GREAT BARRINGTON- TRAFFIC SIGNAL INSTALLATION, ROUTE 7 AT MONUMENT VALLEY ROAD
The work consists of traffic signal installation at the intersection of Route 7 with Monument Valley Road. The installation includes mast arms, traffic signals, wire loop detectors, traffic controller and all miscellaneous wire, conduit, and cable.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Ranjit Sivasubramaniam![]() |
| Estimated Total Federal Participating Construction Cost: | $180,435.00 |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 09/18/2004 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||