Project Description: |
OTIS- BRIDGE REHABILITATION, O-05-005, RESERVOIR ROAD OVER THE WEST BRANCH OF THE FARMINGTON RIVER
The proposed work will replace the bridge superstructure, modify the existing abutments and wingwalls, reconstruct the roadway at the approaches and improve safety by adding guardrail transitions, pavement markings and signing.
|
Location: |
|
Project Manager: | Michael Papadopoulos![]() |
Estimated Total Contract Cost: | $837,973.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|