Project Description: |
SOMERSET- SWANSEA- INTERSTATE RESURFACING ON I-195
The project includes repaving, safety improvements and bridge rehabilitation on the Interstate system. The project begins at the Rehoboth/Swansea line and ends just west of the Braga Bridge for a total project length of 6.7 miles.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $10,949,667.66 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|