| Project Description: |
SOMERVILLE- MULTI-USE PATH CONSTRUCTION, FROM CEDAR STREET TO LOWELL STREET (PHASE I)
The proposed project will construct a bike path along the existing MBTA Lowell Commuter Rail Line between Central Street and Lowell Street and on a spur line connect to Cedar Street.
|
| Location: |
|
| Resident Engineer: | Mohammed Aref-Adib![]() |
| Construction Contract Value: | $2,129,079.00 |
| Construction Bid Price: | $1,857,490.65 |
| Initial Construction Estimate: | $1,894,842.50 |
| District: | District 4 |
|