Project Description: |
SOMERVILLE- MULTI-USE PATH CONSTRUCTION, FROM CEDAR STREET TO LOWELL STREET (PHASE I)
The proposed project will construct a bike path along the existing MBTA Lowell Commuter Rail Line between Central Street and Lowell Street and on a spur line connect to Cedar Street.
|
Location: |
|
Resident Engineer: | Mohammed Aref-Adib |
Construction Contract Value: | $2,129,079.00 |
Construction Bid Price: | $1,857,490.65 |
Initial Construction Estimate: | $1,894,842.50 |
District: | District 4 |
|