| Project Description: |
LITTLETON- WESTFORD- INTERSTATE RESURFACING ON I-495
This project consists of resurfacing Interstate 1-495 from the Boxborough/LIttleton town line, northerly to the bridge over Boston Road in Westford.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $9,735,483.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|