Project Description: |
TEMPLETON- BRIDGE REPLACEMENT, T-02-019, NORTH MAIN STREET OVER EAST TEMPLETON POND OUTLET
The purpose of the project is to replace the North Main Street Bridge over the East Templeton Pond Outlet. Stage construction will allow the bridge to remain open during construction with the use of a temporary signal. A new roadway surface and a sidewalk will be added.
|
Location: |
|
Resident Engineer: | Matthew Minihan |
Construction Contract Value: | $981,201.00 |
Construction Bid Price: | $862,500.93 |
Initial Construction Estimate: | $1,100,553.00 |
District: | District 2 |
|
Bridges
|
|
|
|
|