Project Description:
|
HARDWICK- NEW BRAINTREE- RESURFACING & RELATED WORK ON ROUTE 32 (MAIN STREET)
Project consists of 2" milling and resurfacing on a section of Route 32 (Main Street). The section begins at the Ware–New Braintree TL MM 22.383 and proceeds northerly past the New Braintree-Hardwick T L MM 23.38 in Hardwick for a total project length of 5237 feet. Work includes pavement markings, replacing deteriorated curbing, traffic controls, cleaning drainage structures and pipes, erosion/sedimentation control measures, and other incidentals.
|