| Project Description: |
QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER
The proposed project includes the replacement of the Washington Street Bridge (State Route 3A) over the Fore River in Quincy and Weymouth. The new bridge will be a double leaf bascule or vertical lift bridge. The project also includes approach roadway work and possible intersection improvements/improved geometrics.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ashish Patel![]() |
| Estimated Total Contract Cost: | $273,917,937.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|