Work will consist of the preparation of 25% plans,estimate,type study, sketch plans and permits for replacement of the Quincy-Weymouth Bridge. |
Final |
Statewide-Owner's Representative-Will perform peer reviews and manage cost recovery and value engineering on various projects. |
|
Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. |
Final |
Work will consist of Geotechnical Review during the design of bridge structures and/or roadways owned by MassDOT and Cities and Towns throughout the Commonwealth. |
Final |
Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. |
Final |
Bridge Replacement (Q-01-001=W-32-001) (Steel) (Fore River Bridge) - Route 3A (Washington Street) over the Fore River, (ABP) (DESIGN BUILD PROJECT) |
Completed |
Perform various assignments as the Owner's Representative for the peer review of engineering elements associated with satewide construction projects. |
|
Master Service Agreement for statewide design and review services. |
Final |
Master Service Agreement for statewide design and review services. |
Final |