Project Description: |
ANDOVER- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 125, SALEM STREET AND STINSON ROAD
The proposed project at the intersection of Route 125 at Salem Street and Stinson Road includes new traffic signals, which respond to real-time vehicle approaches. Roadway widening, new pavement markings and a fire pre-emption system to support the existing system are also proposed.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Vicki Volz |
Estimated Total Contract Cost: | $1,205,187.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|