Project Description:
BRIDGEWATER- MIDDLEBOROUGH- BRIDGE REPLACEMENT, B-23-005=M-18-002, SUMMER STREET OVER THE TAUNTON RIVER
The proposed project consists of replacing the existing two-span bridge at Summer Street over the Taunton River with a single span bridge. The proposed bridge superstructure will consist of a reinforced concrete deck slab supported by prestressed concrete spread box beams. The proposed substructure will consist of integral abutments located behind the existing abutments. The existing pier will be completely demolished. The project also includes new bridge railings, highway guard rail and improvements to the approach roadways. The bridge structure will be closed to traffic during construction and a detour route will be implemented.
Location:
  • Town of Bridgewater
  • Town of Middleborough
  • Resident Engineer: Kenneth Belgrave
    Construction Contract Value: $2,326,124.44
    Construction Bid Price: $1,987,145.00
    Initial Construction Estimate: $2,506,654.74
    District: District 5

    Contracts (3) Progress
    # 54837 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 59589 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge ABP projects. Final
    # 67528 -- Construction Contract
    Bridge Replacement (B-23-005=M-18-002) (Concrete) – Summer Street over the Taunton River. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/01/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 04/21/2005
    Project Review Committee Letter 05/09/2005
    Project Status Initiated 04/05/2005
    Project Status Advertised 09/18/2010
    Project Management
    100% Design 100% Package Received 07/13/2010
    100% Design 100% Package Comments to DE 08/26/2010
    25% Design 25% Package Received 01/19/2007
    25% Design 25% Package Comments to DE 03/04/2009
    25% Design 25% Package Comments to DE 05/01/2009
    25% Design Design Public Hearing 01/29/2008
    75% Design 75% Package Received 05/30/2007
    75% Design 75% Package Received 11/23/2009
    75% Design 75% Package Comments to DE 11/03/2008
    Final Design PS&E Received 09/02/2010
    Final Design PS&E to FAPRO 09/14/2010
    Consultant Contract Process Scope to DE 09/15/2005
    Consultant Contract Process NTP Issued 05/08/2006