Project Description: |
BROCKTON- BRIDGE REPLACEMENT, B-25-032, WHITE AVENUE OVER SALISBURY BROOK
The proposed project consists of replacing the existing concrete superstructure with pre-stressed concrete deck beams and a composite concrete deck constructed on new concrete abutments on the back side of the existing stone abutments and reconstructing approximately 100 feet of White Avenue on each side of the bridge with new drainage, asphalt pavement, granite curbing and concrete sidewalks.
|
Location: |
|
Resident Engineer: | Kenneth Belgrave |
Construction Contract Value: | $1,149,534.00 |
Construction Bid Price: | $994,726.00 |
Initial Construction Estimate: | $1,332,971.50 |
District: | District 5 |
|
Bridges
|
|
|
|
|