| Project Description: |
HAMPDEN- BRIDGE SUPERSTRUCTURE REPLACEMENT, H-04-003, CHAPIN ROAD OVER SCANTIC RIVER
The existing bridge superstructure will be demolished and replaced. The superstructure shall consist of one 59.5-foot span with composite steel stringers and a concrete deck. The existing abutments and wingwalls will be modified and re-used.
|
| Location: |
|
| Resident Engineer: | James White![]() |
| Construction Contract Value: | $1,255,824.50 |
| Construction Bid Price: | $1,194,847.50 |
| Initial Construction Estimate: | $1,379,522.00 |
| District: | District 2 |
| Current Status: | Bridge under construction (as of 04/15/2008) |
|