Project Description: |
PELHAM- BRIDGE REPLACEMENTS, P-04-006, MEETINGHOUSE ROAD OVER AMETHYST BROOK & P-04-007, MEETINGHOUSE ROAD OVER HARRIS BROOK
The purpose of this project is to replace the two bridges on Meetinghouse Road that cross over Amethyst and Harris Brooks. Both bridges are single span, one lane steel beam structures. They will be replaced with single span rigid frame structures with cast in place footings and wingwalls. The span length will be 22 - 24 ft with a width of 16 ft (13 ft curb to curb).
|
Location: |
|
Resident Engineer: | Anthony Kuralowicz |
Construction Contract Value: | $2,109,505.50 |
Construction Bid Price: | $1,878,005.00 |
Initial Construction Estimate: | $1,842,000.00 |
District: | District 2 |
|