BROCKTON- RECONSTRUCTION OF ROUTE 27, PLEASANT STREET AT WEST STREET AND WESTGATE MALL DRIVE
The proposed project consists of roadway modifications and the reconstruction of Route 27, Pleasant Street, West Street and Westgate Mall Road. Vehicular operations are anticipated to be improved as a result of the proposed roadway widening, geometric improvements, new traffic signals and interconnection of signalized intersections.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | William Chi![]() |
| Estimated Total Contract Cost: | $3,549,136.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|