| Project Description: |
CHICOPEE- RECONSTRUCTION & RELATED WORK ON FULLER ROAD, FROM MEMORIAL DR (RTE 33) TO SHAWINIGAN DR (2.0 MILES)
The project includes pavement rehabilitation, drainage improvements and upgrading the existing traffic signals for a closed loop coordination on this city-owned street. Other work includes bicycle and pedestrian accommodation improvement. The project extends from Memorial Drive (Route 33) easterly to Shawinigan Drive for a total length of 2 miles.
|
| Location: |
|
| Construction Begins: | Autumn 2020 |
| Resident Engineer: | Jessica Gaudet![]() |
| Construction Bid Price: | $9,394,879.50 |
| District: | District 2 |
|