Project Description: |
ACTON- CONCORD- BOXBOROUGH- LITTLETON- RESURFACING & RELATED WORK ON ROUTE 2
This project consists of resurfacing Route 2 in Acton, Concord, Boxborough and Littleton. The western limit is the Route 2 bridge over the B&M RR in Littleton (mm 113.9±). The eastern limit is the Acton / Concord town line (mm 120.1±).
|
Location: |
|
Resident Engineer: | Roger Wykes |
Construction Contract Value: | $6,908,706.56 |
Construction Bid Price: | $5,665,092.00 |
Initial Construction Estimate: | $5,306,184.00 |
District: | District 3 |
|