Project Description:
MARSHFIELD- SCITUATE- BRIDGE REPLACEMENTS, BR# M-07-019=S-07-014, JULIEN STREET OVER THE SOUTH RIVER AND BR# M-07-003=S-07-003, SEA STREET OVER THE SOUTH RIVER (CAPT. FRED. STANLEY BRIDGE)
This bridge project includes the demolition and removal of timber piers, wingwalls, partial removal of abutments, and removal of the timber superstructure. The work consists of the construction of a five span concrete bridge, two concrete abutments, four wingwalls, four concrete filled steel pipe piers, and the reconstruction of approximately 400 feet of the Bayberry Road/Julian Street bridge approaches. The bridge will be closed to vehicular traffic during construction and traffic will be diverted away from the site through a detour route. Also, the proposed Captain Stanley Bridge will replace the existing wooden bridge with an eight span pre-cast concrete bridge. Sidewalks and lighting will also be added. The adjacent intersections will also be made handicap accessible. Passage below the bridge by boat traffic will be enhanced with a wider channel and greater vertical clearance than the existing bridge.
Location:
  • Town of Marshfield
  • Town of Scituate
  • Resident Engineer: Kevin Morrissey
    Construction Contract Value: $14,626,162.23
    Construction Bid Price: $11,928,524.00
    Initial Construction Estimate: $8,150,220.50
    District: District 5

    Contracts (1) Progress
    # 45675 -- Construction Contract
    Marshfield - Scituate - Bridge Replacements - Julian Street (M-07-019=S-07-014) (Steel) and (M-07-003=S-07-003) (Steel) - Sea Street Completed

    Bridges

    Contract Dates
    Notice to Proceed: 10/13/2006
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 09/30/2005
    Project Status Initiated 06/09/2005
    Project Status Advertised 09/30/2005
    Project Management
    100% Design 100% Package Received 02/08/2005
    100% Design 100% Package Comments to DE 05/24/2005
    Final Design PS&E Received 08/08/2005
    Final Design PS&E to FAPRO 08/08/2005