| Project Description: |
NORTHBRIDGE- BRIDGE REPLACEMENT, N-21-002, ROUTE 122 (PROVIDENCE ROAD) OVER THE BLACKSTONE RIVER (AKA ROSAIRE "ROSS" ROJETTE MEMORIAL BRIDGE)
The work involves the replacment of the bridge carrying State Route 122 (Providence Road) over the Blackstone River with a 32-foot wide (measured curb-to-curb) bridge. The new bridge will have a 6.5-foot sidewalk on the east side.
|
| Location: |
|
| Project Manager: | Morteza Tayarani![]() |
| Estimated Total Contract Cost: | $3,954,850.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|